![]()
In partnership with HDR, Inc., HART has been working on a Project Development and Environment (PD&E) Study for its Bus Rapid Transit project. The final draft Preliminary Engineering Report for the North-South Corridor was completed in November 2009. To view each section of the document in PDF format, click on the links below.
HART will be accepting comments on the report until 5 p.m. on Friday, November 20th. You may provide comments by the following methods:
Hillsborough Area Regional Transit
Attn: Engineering Department
1201 E. 7th Avenue
Tampa, FL 33602
Fax
(813) 223-7976
Attn: Engineering Department
North / South Corridor BRT
Project Development and Environment Study (PD&E)
PRELIMINARY ENGINEERING REPORT
Complete Report (308 MB)
Front Cover (1.53 MB)
Table of Contents (110 KB)
Chapter 1 (376 KB)
Chapter 2 (40 KB)
Chapter 3 (1.58 MB)
Chapter 4 (18.3 MB)
Chapter 5 (1.74 MB)
Chapter 6 (3.79 MB)
Chapter 7 (267 KB)
Chapter 8 (2.11 MB)
Chapter 9 (2.05 MB)
Chapter 10 (39.9 KB)
Chapter 11 (47.7 KB)
Appendix A (33.1 KB)
Appendix B (102 MB)
Appendix C (175 MB)
Appendix D (1.25 MB)
Appendix E (3.11 MB)
Back Cover (992 KB)
North / South Corridor
Bus Rapid Transit (BRT)
TRAFFIC AND SIGNAL ANALYSIS
Traffic & Signal Report (15 MB)
Fletcher Avenue Collision Analysis (391 KB)
Reference Reports for Traffic & Signal Analysis
FDOT Transit Facility Handbook (13.1 MB)
Naztec Operations Manual for Transit Priority (1.79 MB)
Training Manual for NTCIP Based TS2 / 2070 Controllers (6.12 MB)
Opticom GPS Brochure (504 KB)
Plans Preparation Manual, Volume 1 – Chapter 7, Traffic and ITS Design (241 KB)
Signalization Pre-emption Design Standards (21.9 KB)
Transit Signal Priority (TSP): A Planning and Implementation Handbook (1.11 MB)